In-grid microgrid for industrial applications
Challenge: An industrial lithium battery factory required peak load management for systems over 100kW and simultaneously support for a 180kW EV charger.
Our Solution: Lindemann-Regner implemented its own Microgrid MP-ESS-200 cabinet module, coupled to the existing 137kWp PV system. The system seamlessly handles peak shaving, energy management, and EV charger support.
Project Progress: The team calibrated the system for peak loads, integrated the PV system, and conducted extensive tests on load distribution and efficiency.
Result
The microgrid increases the efficiency and reliability of industrial power supplies.
- Optimized peak shaving
- Full support for 180kW EV chargers
- Integration of the existing PV system
- Cost savings and sustainable energy use
Technical Highlights
Technological features enable optimal performance.
- MPX-ESS-200 DC-coupled
- Intelligent load management and peak shaving
- TÜV and VDE certified


Quantified Effects
Specific key figures demonstrate the effectiveness of the system.
100 %
Full integration with existing PV system.
+20 %
Reduction of peak load through intelligent peak shaving.
+10 %
Increasing operational energy efficiency.
-15t/year
Saving CO₂ through the use of renewable energies.