• 2025
  • Belgrade, Serbia

5MVA Microgrid for Bus Depot

Challenge:A new electric bus depot for 50 YuTong buses required simultaneous high-performance charging and a stable power supply without grid overload.

Our Solution: Lindemann-Regner developed the technical design for a 5MVA microgrid solution: Grid Access, PV integration, load management for 50 EVs simultaneously.

Project Progress: Planning, PV design, load management systems, integration into the local grid, simulation and commissioning of the high-performance charging points.

Result

The project supports the sustainable modernization of public transport infrastructure:

  • High-performance charging points for 50 EV buses
  • Maximum use of solar energy
  • Reduced operating costs
  • High network stability and flexibility

Technical Highlights

Advanced features ensure efficiency and reliability:

  • 5 MVA Grid Access Microgrid
  • PV integration and intelligent load management
  • TÜV and CE certified

Quantified Effects

The figures illustrate the benefits for energy efficiency and sustainability.

50PCs

High-performance charging for 50 YuTong electric buses.

100 %

Security of supply for simultaneous charging.

+25 %

Increasing the share of renewable energy in depot operations.

-40t/year

CO₂ savings through the use of solar power.