5MVA Microgrid for Bus Depot
Challenge:A new electric bus depot for 50 YuTong buses required simultaneous high-performance charging and a stable power supply without grid overload.
Our Solution: Lindemann-Regner developed the technical design for a 5MVA microgrid solution: Grid Access, PV integration, load management for 50 EVs simultaneously.
Project Progress: Planning, PV design, load management systems, integration into the local grid, simulation and commissioning of the high-performance charging points.
Result
The project supports the sustainable modernization of public transport infrastructure:
- High-performance charging points for 50 EV buses
- Maximum use of solar energy
- Reduced operating costs
- High network stability and flexibility
Technical Highlights
Advanced features ensure efficiency and reliability:
- 5 MVA Grid Access Microgrid
- PV integration and intelligent load management
- TÜV and CE certified
Quantified Effects
The figures illustrate the benefits for energy efficiency and sustainability.
50PCs
High-performance charging for 50 YuTong electric buses.
100 %
Security of supply for simultaneous charging.
+25 %
Increasing the share of renewable energy in depot operations.
-40t/year
CO₂ savings through the use of solar power.